This shot is looking back to where we just came from. The cut can be seen in the distance and a washout that we just crossed over. This is the longest tangent section that we have seen.
At this point the power lines invade the ROW. Another small wash out ahead and the bridge should be coming into sight soon.
After a peaceful hike we finally approach our final objective for the day, the Gila River bridge. As with all other remaining bridges along this line it is stripped of all the decking.
Dave
Edited 1 time(s). Last edit at 04/27/2009 08:29PM by ROW Explorer.