Welcome! Log In Create A New Profile

Advanced

Re: Ongoing Work on C&S Caboose 1006 - Part 3

February 24, 2020 05:23PM
The draft gear beams and cheek plates have been mounted on the A End (cupola end) of the new frame.
84357134_1490419427778627_2201787200150962176_o.jpg


The bolts which attached the draft gear sills to the frame have been countersunk into the top of the sills (as seen on left-hand sill). Originally the bolt heads rested on top of the sills (as seen on the right-hand sill), however this will create problems with the installation of the floorboards.
83965689_1490415121112391_5977653779409928192_o.jpg


All of the frame components are being installed with square head bolts with square nuts, provided at cost by Hi-Strength Bolt Company of Denver.
These bolts were made by welding a square nut to a custom length double end stud (we were not able to source the correct length of square head bolt).
83844659_1490415204445716_3509842764575539200_n.jpg


The square nuts needed for the truss rods were a challenge to source. One end of the rods features 1-1/4"-7 thread, which is easy to find. The other end features 1-3/8"-6, which is next to impossible to source in a square nut. Fortunately we were able to source four pieces from a vendor who wanted to be rid of them for cheap.
48275222_1156431101177463_2125550491264876544_o.jpg


The attachment of the draft gear beams also includes keys between the draft gear beams and the center sills.
83832557_1490415164445720_7245656269833371648_o.jpg
Subject Author Posted

Ongoing Work on C&S Caboose 1006 - Part 1 Attachments

Shane Schabow February 24, 2020 04:43PM

Ongoing Work on C&S Caboose 1006 - Part 2 Attachments

Shane Schabow February 24, 2020 05:05PM

Re: Ongoing Work on C&S Caboose 1006 - Part 3 Attachments

Shane Schabow February 24, 2020 05:23PM

Re: Ongoing Work on C&S Caboose 1006 - Part 4 Attachments

Shane Schabow February 24, 2020 05:39PM

Re: Ongoing Work on C&S Caboose 1006 - Part 4

Samart February 24, 2020 05:52PM

Re: Ongoing Work on C&S Caboose 1006 - Part 5 Attachments

Shane Schabow February 24, 2020 06:00PM

Re: Ongoing Work on C&S Caboose 1006 - Part 5

Rick Steele February 26, 2020 10:48AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

wcohen February 24, 2020 05:43PM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

James February 24, 2020 05:58PM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

Will Gant February 26, 2020 10:14AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

round_house February 25, 2020 07:21AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1 Attachments

Shane Schabow February 25, 2020 08:24AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

SilvertonBranch February 25, 2020 08:16AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

Shane Schabow February 25, 2020 08:39AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

craig February 25, 2020 11:11AM

Re: Ongoing Work on C&S Caboose 1006 - Part 1

Shane Schabow February 25, 2020 12:10PM