Hi,
Lot's of good ideas.
1) Find a stable funding source (Donald Trump where are you?).
2) Get a K37 working.
3) See about aquiring a K28.
Long term:
4) Get patterns and plans made for: C16, C17, C18, C18, C21, C25 maybe a class 56.
4.5) Duplicate a T-12. I think a T-12 might have possible applications for other narrow gauge lines and renting out the plans and/or patterns would be a very small income source.
5) Get a large erecting shop with overhead crane.
6) Set up a WORKING dual gauge track display. With narrow gauge locos and equipment, a dual gauge idler, and two historic SG box cars, this should be easy (maybe purchase a dual gauge switch or three from the EBT?)
7) Set up access to the original D&RGW Antonito Depot by rail for possible movie work. Either on the old alignment or by adding another crossing of the irrigation ditch past the place where the building(s) are ont he original ROW.
Doug vV