Below was my view from the backhoe as Dusty, Brett, and myself installed the stack.
Dusty and Paul are working on a forward section of the brake pipe. Lots of fine tuning on that piece.
Below you can see much of the cab plumbing mocked up. At this point we are just starting to replace the air brake piping in the cab. We will modify the pipes slightly to accommodate for the second water glass.
New sand pipe and trap. The bell with new clapper is also visible.
Jeff Taylor
CRRM curator of equipment and rolling stock.