rehunn Wrote:
=======================================================
> Jessica, very nice. The interesting shots would be
> the piping interface
> with the platform ie did the lines come from
> underground up into the
> platform or where they are ground level after
> crossing under the road.
> What type of shutoffs and isolation valves
> existed, etc.
rehunn.
Main delivery pipe came up from the ground at the east end of the platform. It had a large shut off valve 3-4' above ground level.The main pipe ran under the bottom of the platform walkway. Each of the eight filler pipes had a shut off valve about even with the top handrails. Don't forget the tool box under the platform.