Earl Wrote:
=======================================================
> My notes on all this are packed away,
> but I think 483 did pick up the flat w/
> dozer & some other stuff at Sublette
> on the way to Alamosa in Dec., 68.
>
> The work train ran in July, I think.
> Once again, my notes are packed away.
Must have been two different dozers then, as my photos from August 29 show #498 with just 14 boxcars approached Apache crossing and #498 with a boxcar, a dozer on a flat, and several more boxcars from about mp 287 through Antonito and on into Alamosa. I'm not sure whether the two cars were picked up at Toltec Siding or at Sublette, but I vaguely remember reading that there was some work done that summer on the stretch of rough track just west of Calico Cut, and so presume is was the former.