Jimmy posts, "Exhibit B was attached to this agreement and listed the valuation of Durango Terminals. Included in the valuation were 3.12 acres, right of way San Juan Smelter Extension, Four 48-feet frame spans San Juan Smelter Extension, and 5,937 lineal feet of track San Juan Smelter Extension."
Thanks Jimmy. Remember, the San Jaun Smelter was
NOT the smelter across from the roundhouse. The Standard was down river from that one. Did it show any trackage rights to the Standard?
Tom C.
Later;
tom_srclry_com
A student of the Southend RGS!
Edited 1 time(s). Last edit at 10/24/2010 06:36PM by tomc.