I guess I'll look through my photos and see what can be scanned and be posted. We had plans for the other tipple that the BLM tore down above Placerville, but they were in some model railroad magazine--sort of strange to ask for plans and specifications and have the fellow in charge hand us a magazine. But almost everything we needed was on the ground in front of us and we didn't need much to go on. The tricky part was building a new cable anchor to replace the rock-filled wood crib that was pretty well shot. The cables are well secured on the upper tram terminal. We had to transfer the load to the new cable tie and cut the old cables--I check it out everytime we drive past on our way to Telluride and so far it is holding.
Fritz