Welcome! Log In Create A New Profile

Advanced

Re: FRA Par 213.9

November 15, 2006 04:57AM
During the years that I was managing shortline railroads, we strived to maintain ties and surface at Class 2 conditions, though we operated the railroad with a maximum speed of 20 mph. This kept the wear and tear on the equipment reasonable. In fact, we tried to maintain line and track surface to Class 3 specs for the same reason. The work underway on the C&TS will cut down on the long-term deterioration of the track while reducing everyday wear and tear on the equipment. It's not necessary to run the trains at 25 or 30 mph, but the ride for passengers will be improve.
Subject Author Posted

Trackwork on the C&TS

Kevin November 14, 2006 09:00AM

(Message Deleted by Poster)

Dick Seelye November 14, 2006 06:51PM

Re: FRA Par 213.9

J.B.Bane November 14, 2006 08:12PM

1941 Timetable

John Frank November 14, 2006 08:48PM

Re: 1941 Timetable

J.B.Bane November 14, 2006 09:17PM

Re: 1941 Timetable

earl November 15, 2006 10:58AM

Re: 1941 Timetable

J.B.Bane November 15, 2006 01:33PM

(Message Deleted by Poster)

Dick Seelye November 14, 2006 09:48PM

Re: FRA jurisdiction - You don't ask..

Dan Robirds November 15, 2006 02:23PM

Re: FRA - Consider this

Dan Robirds November 15, 2006 02:36PM

Re: FRA Par 213.9

G. W. Laepple November 15, 2006 04:57AM



Sorry, you can't reply to this topic. It has been closed.