rod Wrote:
-------------------------------------------------------
> Jimmy Blouch Wrote:
> --------------------------------------------------
> -----
> > Friday May 6 1949
> >
>
> >
> > Farmington branch Work extra 463
> > Conductor McCormick
> > Engineer Buchanan
> >
> > On duty 8:00 AM at Aztec
> > Worked between mile post 462 and 490 loading
> and
> > unloading rock
> > Tied up Aztec 7:00 PM
> >
>
> Jimmy:
>
> Is there any indication of what MOW equipment was
> being used to load and unload the rock on the
> work train?
Air dumps were used for moving the rock.
I have not yet seen what was being used for loading.
Jimmy