John Cole Wrote:
-------------------------------------------------------
> Rod, I have forwarded the thread to John Engs and
> we will find out next summer. We went by the TEE
> fittings on the main 4" pipe running down the rack
> and stubbed out the 2" filler pipes with valves
> whenever we got to one so we will see. Forget
> nailguns, that is REAL 2"X12" lumber and our
> nailguns will only shoot a short 16D nail. (About
> 3 1/4" long) so we used some seriously long deck
> screws, (hold better and we can remove them).
John:
You can use the vertical support uprights as a visual reference (we know those did not change) for verifying the filler pipe locations along the rack as shown in photos. Refer back to the rack drawing I originally sent you to line everything up.
Rod