Re: Sumpter Valley Trackwork

April 14, 2015 10:07PM
3' rebar driven through holes drilled in each tie. The ties are set back about 1/3 width each row. Took half a day to prepare a level base and set the ties for Tom and I, and the other half for the 3 of us to empty the car. As we were dumping to only one side we had to trip only one door at a time and shovel the opposite side out the empty door before tripping another door.

We didn't want to tip the car over, so had to keep it somewhat balanced. The turning wye was 2 1/2 miles away, so running back and forth would have been more time consuming than shoveling.

The WP&Y tipped some side dump cars over and they took the #19 with them into the lake. We like to learn for others misfortune whenever possible.
Subject Author Posted

Sumpter Valley Trackwork Attachments

eric April 14, 2015 10:09AM

Re: Sumpter Valley Trackwork

nedsn3 April 14, 2015 10:54AM

Re: Sumpter Valley Trackwork

Jim Grigsby April 14, 2015 11:28AM

Re: Sumpter Valley Trackwork

rehunn April 14, 2015 11:10AM

Re: Sumpter Valley Trackwork

bcp April 14, 2015 12:04PM

Re: Sumpter Valley Trackwork

Taylor Rush April 14, 2015 02:39PM

Re: Sumpter Valley Trackwork

Jerry Huck April 14, 2015 07:31PM

Re: Sumpter Valley Trackwork

Jim Grigsby April 14, 2015 07:03PM

Re: Sumpter Valley Trackwork

philip.marshall April 14, 2015 07:43PM

Re: Sumpter Valley Trackwork

Jim Grigsby April 15, 2015 09:26PM

Re: Sumpter Valley Trackwork

GeorgeGaskill April 14, 2015 06:42PM

Re: Sumpter Valley Trackwork

J.B.Bane April 14, 2015 08:16PM

Re: Sumpter Valley Trackwork

waynek April 14, 2015 10:07PM

Re: Sumpter Valley Trackwork

eric April 14, 2015 10:17PM

Re: Sumpter Valley Trackwork

eric April 14, 2015 10:07PM

Re: Sumpter Valley Trackwork

Bill Pratt April 16, 2015 11:57AM

Re: Sumpter Valley Trackwork

rehunn April 14, 2015 08:23PM



Sorry, only registered users may post in this forum.

Click here to login