From the Crested Butte map set
- 1471' siding parallel to the main which started below the curve across from Lily Lake passing by the breaker and scales (track #4)
- 681' siding on the west side of the main near the end of track (track #5)
- 358' turntable track coming off of track #5 (track #6)
- car body depot near turntable
- shed near end of track
- 4'6" x 6' x 6' pit for the water crane
- tank up on the hill listed as 24'x 16' connected to water crane pit by 1420' pipe
- 4 bridges beyond Kebler Pass with one being 376' long.
- one of the bridges has a culvert under it, 3 log lines
- also a few "Cribings" coming into Floresta
The map shows that the ROW at Floresta was sold to Colorado Fuel & Iron, 4/26/1950.
Dave