June 27, 2010 07:06AM
Charlie,

Panel track would be a tough way to go on a steel trestle like Lobato. Typically, bridge ties are dapped (or notched) to slip over the tops of the two steel stringers. Then once you have laid all the bridge ties, your surveyor will located centerline of track to make sure you are locating the line side of the first rail so as to get the track truly centered on the structure. Guard rails, hook bolts and spacing straps and the walkway would round out the materials that get installed on an open deck bridge.

Can anyone confirm if dapped bridge ties are/were standard on the D&RGW NG system?

Rob Gardner
Subject Author Posted

Panel track for Lobato

CharlieMcCandless June 27, 2010 06:22AM

Re: Panel track for Lobato

John E. Bull June 27, 2010 06:43AM

Re: Panel track for Lobato

Rob Gardner June 27, 2010 07:06AM

Re: Panel track for Lobato

bookemdanno June 27, 2010 09:04AM

Re: Panel track for Lobato

CharlieMcCandless June 27, 2010 07:39AM



Sorry, only registered users may post in this forum.

Click here to login