Hi everybody,
Q&TLRR #6 has been stripped of its cab and smokestack and is ready to be picked and loaded on a low-boy trailer for a trip back to Hancock, MI. It was originally scheduled to be picked on June 15th but it has now been re-scheduled for July 20th. A section of teack has been laid in front of the Q&TL Enginehouse, upon which the locomotive will be set and the plan is to move it back inside, after the roof is treplaced. Money for the move and "restoration" has been obtained through some donations but more is being sought. The tender and loose parts will come on another shipment at a later date, probably in a dump-bed truck. The Russel Plow is still being debated.