Welcome! Log In Create A New Profile

Advanced

Chama Roundhouse Retirements

January 25, 2001 09:06AM
A.F.E. T9905 1944 (Same A.F.E. for the Turntable)
Retire part of Roundhouse up to partition built in 1929 including 4 stalls & 3 pits.
Cover existing partition with drop siding & flintrate roffing paper to make a permanent outside wall $191.89
Building retired 89110 cu ft volume,
Foundation-concrete 179.4 cy
Excavation-common 150 cy
7 engine pits-concrete 172 cy
Engine pit excavation-common 152 cy
Lumber new untreated MBM 5,550
Drains 6" vit. clay pipe & fittings 175 Lin. ft.
Steam lines 3" covered W.I.pipe & fittings90 L.F.
" " 1 1/2 " " " " 75 L.F.
Air lines 1 1/2 covered W.I. pipe & fittings 65 L.F.
Water lines 2 1/2 covered W.I. pipe & fittings 35 L.F.
16 Stoves and 224 Liner Feet of stove pipe...
Total cost 9,803.88
A.F.E. 4386 1956 Retire 3 stalls of Eng. house, cost 5,688.79
Subject Author Posted

Chama Roundhouse Retirements

John Templeton January 25, 2001 09:06AM

Re: Chama Roundhouse Retirements

Frank Martindell January 26, 2001 09:55AM

Re: Chama Roundhouse Retirements

John Templeton January 26, 2001 10:18AM



Sorry, you can't reply to this topic. It has been closed.