Re: Colorado Railroad Museum Projects

December 29, 2000 03:59PM
318's drivers are in the roundhouse the frame should follow shortly. Repairs will be made to the frame and the frame tramed. The boiler will be sent to Strasburg Pa. as soon as money is available. Once there engineering studies will be made and a new boiler fabricated. The turntable pit has been dug and the center bearing placed, and again waiting for necessary funding. There are several track projects under way, including the table lead. Help is always needed and appreciated.
And also funds. Keith Goodrich crm track