Earl Wrote:
-------------------------------------------------------
> Give the WW&F gang another week, they will have heat, smoke jacks installed, and it will be 80 degrees inside the building.....
I'd be happy with 50 degrees.
There are plans to install a coal stove when the roof thimble arrives. Brendan is building the delivery doors that go in the back of the center stall, that's the last part to closing in the building. Fire stop compound will be sprayed on the roof rafters before the insulation is applied, a metal ceiling will follow.
The back wall of the run-through stall was finished this week with adding the trim boards and cedar shingles.