Part II ;
Bridge timbers donated by the BNSF being cut to size for their new job as timbering around the turntable pit. The skid loader was used to haul the timbers to the saw and then place then around the pit using the turntable.
Timbers laid out around the turntable and ready for installation
Progress was made in sorting the jumble of rail moved in last year into neat stacks by size
The roadbed for track 13, from the turntable to the ashpit was leveled and ready for ties
Looking from the turntable towards the ashpit. (the ashpit is just behind RGS 256)
Jason Midyette