Welcome! Log In Create A New Profile

Advanced

Re: 4-rail to 3-rail dual gauge track

September 09, 2008 10:04AM avatar
Eric Bolton Wrote:
-------------------------------------------------------
> ... a second three into
> four setup in our carbarn yard. Also if you look
> further down into the yard in the picture you will
> see the ex EBT 3 way stub switch. If you have any
> questions feel free to ask.

As far as I am aware, the EBT is not missing any three way switches (there are three on the property today). Or is it an ex-EBT harp switch stand connected to a three way switch, as many two way stub switches at the EBT have three positions on the stand?

Christopher D. Coleman

[www.febt.org] Friends of the East Broad Top
[www.spikesys.com] East Broad Top Homepage
[www.eastbroadtop.com] East Broad Top Railroad
Subject Author Posted

4-rail to 3-rail dual gauge track Attachments

mfmalk September 07, 2008 07:31PM

Re: 4-rail to 3-rail dual gauge track

CharlieMcCandless September 07, 2008 07:56PM

Re: 4-rail to 3-rail dual gauge track

Brian Norden September 07, 2008 10:14PM

Re: 4-rail to 3-rail dual gauge track

ebtrr September 08, 2008 10:52AM

Re: 4-rail to 3-rail dual gauge track

tomc September 08, 2008 10:59AM

Re: 4-rail to 3-rail dual gauge track

dougvv September 09, 2008 01:15PM

Re: 4-rail to 3-rail dual gauge track

ebtrr September 09, 2008 04:44PM

Re: 4-rail to 3-rail dual gauge track

dougvv September 09, 2008 05:49PM

Re: 4-rail to 3-rail dual gauge track

drgw0579 September 08, 2008 11:43AM

Re: 4-rail to 3-rail dual gauge track

Eric Bolton September 08, 2008 04:35PM

Re: 4-rail to 3-rail dual gauge track

ebtrr September 09, 2008 10:04AM

Re: 4-rail to 3-rail dual gauge track

mesaman3000 September 08, 2008 08:46PM

Re: 4-rail to 3-rail dual gauge track

Eric Bolton September 09, 2008 02:15PM



Sorry, only registered users may post in this forum.

Click here to login