A.F.E. #4543 9-30-1930 $11,800.02
Combine.Pass.&Frt.Station 141'6"x25'x10'30,000 Cubic Feet, 2 bays 4x7x10' each.
Basement, irregular shape,36 ln.ft.1x9'&24ln.ft.,1x5'(ext.of fdn wall).plain concrete 18.6 cu.yards.
Foundation,exc.dry earth 18.6 cu. yards.
Plain Concrete 66.7 Cu. yards.
Chimney,1 brick 1'6"x1'6"x26' to floor of basement.
Walls, plain concrete 1' thick up to point 1'6" above frt. comp. floor and 2'6'' above waiting room floor; balance 2nd hand common brick1' thick 7'6" high-stucco-tapestry brick trim.
Roof, gabled, trussed 2x6" fir on 2' centers, red comp shingles,tile ridge,2' overhang.
Openings:6 O.S. sliding baggage doors 7x7'x1 1./2" paneled, 2 O.S. paneled & glass doors 3x6'6"x1"glass transoms. 4 I.S.(inside)paneled doors 2'6"x6'6"x1", 2 toilet swing doors 2'6"x4'x1", 1 coal door 3'x2'x1 1/2", 6 windows, 3 lt. each 28x30".
Floors2x12 fir on 16"ctrs. on concrete fdn., sleeper8x18"on blocks under baggage comp.- baggage floor 2" fir- office & waiting room 2" sub-floor & 3/4"fir flooring.
Passenger Platform, 2661 c.bic yards-cinder filling with gravel surface.
Freight Platforms: 1492sq.ft.platform & 332 sq. ft.ramps-8x8"posts on blocks,8x18" stringers 4'c-3" planking, 1" skirting.
Partitions, 131 liner feet,9' high, wood lath & plaster on 2x6"-2' ctrs.
Interior-pine surface trim.
Shelving,52lin.ft. 1x12" rough pine.
Plumbing, 2-lavatories,2-toilets(flush),1 wall urinal & 1-drinking fountain.,101 lin.ft. 1 1/4" Gal.iron pipe in 5' trench.81 lin.ft.6" sewer pipe in 5' trench.
Heating,steam, 1-#365 Contintel L.W. line bolier in basement.
Wireing: electric wiring in 1/2" conduit, 20 outlets.
A.F.E. #T6187 1937
Install steam line from connection to station heating plant to point immediately outside of station building for steam hose connection to provide heat for N.G. passenger equipment.1 1/2" black pipe & fittings(inside bldg.) 45 lin.ft.
3/4" black pipe & fittings-4' bury 10 lin.ft.
2- 1 1/2"Barco steam joints
2-globe valves 1 1/2"
25' 1 1/2" steam hose
1- hose head 1 1/2"
60 lin.ft. of 1 1/2" 85% Magnesia pipe covering
1- 3/4" Sarco steam trap
Total cost $142.16