Steve, at this point we plan to test run 315 next spring, after the cold season is over. The idea is to test-run on the D&SNG before the trains run to Silverton, and that doesn't work out, testing on the C&T is not ruled out. I have talked informally to the C&TS and they seem very enthusiastic about having the 315 visit their railroad in 2007. We hope to have more serious talks next month.