We loaded/unloaded 5 cars this weekend on the new line into the new shop.
Used the 18 ton to do the ballasting work, and things went well. All that is left to do is to put a eye-ball level on the track.
The two open airs, and the #5 caboose are now under cover. Should have built a 110 foot long building, cause if the building had doors we couldn't shut them. the couplers at both ends of the three cars wouldn't let us close the doors.
Was fun, and I got a chance to use my new digital camera, got you great shot of the 19 working hard.
After I figure out how to work on them on my Mac, I will try to post a short clip of it crossing Hwy. 7.
May try to post a pic of the ballast train.
ron