April 24, 2001 10:22PM
Things have been moving right along in snowy Silver Plume. We have finished painting all of the covered cars and only have one car left to letter. Engine 14 is ready for the season after some minor bearing work. Work on # 12 is slowly getting done. We now have the new center line shaft segment installed and should have the entire shaft assembled later this week. As an added bonus to the shop work this year we were able to fully restore former Westside Lumber Company Model A speader #14 to service. Work on #44 has slowed down quite a bit. We have started to set up the Mecabe flanger, so we can do a new rear flue sheet. As noted before, D&RGW coach 280 will be arriving in silver Plume on friday.
Josh Levine
Georgetown Loop Railroad
Silver Plume Shop
Subject Author Posted

Georgetown Loop visit

Curtis F. April 24, 2001 04:24PM

LOOP UPDATE

Josh Levine April 24, 2001 10:22PM

Re: Georgetown Loop visit

Steve Peck April 25, 2001 02:44PM

thanx steve NM *NM*

the Josh April 26, 2001 12:11AM



Sorry, you can't reply to this topic. It has been closed.