SVRR's new archive and library building is ready for occupancy. We met with our contractor yesterday, pronounced it done and received their set of keys. My wife Jane and I wasted no time in washing the windows on the inside and installing the shades. With help from Jim Grigsby we moved the new shelving from the car shop into the new building. Jane and I got one unit of shelving assembled. This one is for part of our book collection. Two more units of new shelving are yet to be assembled in the archive storage room. I didn't take any new outside photos as it was raining and snowing! The only change since the last outside shots is some additional gravel around the front door slab.
Edited 1 time(s). Last edit at 03/28/2024 05:03PM by J.B.Bane.