The Ordway facility shut down after rushing to "complete" Colorado & Southern RPO #13 in 2001. (The car is mostly done, with the exception of the brake system which was not reinstalled and was loaded into the car for shipment to Silver PLume. That aside, the overall quality of the work was quite good, though costs were quite high)
Jason Midyette