Jimmy Blouch Wrote:
=======================================================
> Monday January 13 1941
>
> DURANGO
>
> Farmington branch extra 478
> Conductor Fry
> Engineer Klhan
>
> Depart Durango 1:30 AM with 7 empties
> Carbon Jct 10 minutes switching, includes pick up
> 3 cars cattle
> Aztec 10 minutes switching
> Refinery 25 minutes switching
> Arrive Farmington 5:15 AM with 8 loads 9 empties,
> 20 minutes eat, 10 minutes turn, 40 minutes
> switching and unload stock
> Depart Farmington 6:30 AM with 3 loads 3 empties
> 2 gas Durango
>
1 gas Silverton
> 2 empty box
> Arrive Durango 9:45 AM with 3 loads 5 empties
>
> Durango switch engine 268 foreman Gabbe engineer
> Fitzer
>
> Jimmy
Jimmy:
I don't recall if I have ever seen a photo of tanks moving on the Silverton branch. I thought that Silverton's oil and gas was supplied by a distributor in Durango? Will tomorrow's (Tuesday) Silverton mixed consist tell you the car type / # and consignee for this load? Thanks.
Rod