Russ, and all I don't think there is going to be any more work days till spring. Keep an eye on the website
www.carsoncolorado.com, they usually post the dates for the next work day ahead of time.
Although there are no workdays coming up soon, there is still a lot of work being done Off site.
Here is a list of such work listed on the site.
*Both injectors are currently well along in their rebuilding in Virginia City by Charlie Cross
* All air brake valves are in Durango and have just begun the rebuilding process by D&S air brake mechanic Chris Brophy.
* Cab is in Olancha and will be thoroughly documented as per locations of electrical, stripped, sandblasted have the metal repaired and primered. This is phase 1 of the cab project that will likely take 1-1 1/2 years.
* Classification lamps are being rebuilt for ultimate operation and more immediately for display at museum.
* All cab windows are being repaired/rebuilt by Dennis Burke.
* Tender ice box is being rebuilt by Dennis Burke as well.
* Gerry Mulryan of Mohave is beginning to build a new pair of water glass valves to match the existing ones and go with our newly donated water glass.
* And from the last work session, Paul Vaughn is still working on cutting and donating all of the tender deck wood and cab floor wood.