No, not quite. Rail now goes into the engine house but the stub switch still needs the slide plates spiked down and the switch stand installed. Not all of the D&S crew has been available the last couple of weeks, so work has slowed down. The 315 sits next to the depot under its protective covering. Work has started on the second stall and the pit cleaned out. Work on that will not start for maybe 2 weeks. Here's a picture of how the 315 looks right now:
[