TARIN DELAY REPORT
TRAIN NO.: Ex (Extra) ENGINE NO.: 483 DATE: 10-18-1950
Alamosa: 6:20AM-7:10AM. 50 Min. Bills, Orders, Waiting for #215.
Antonito: 9:25AM-9:40AM. 15 Min.Coal, Water, Set out.
Big horn: 10:25AM-11:15AM.50 Min. Meet Extra 491 East.
MP 320 1/2: 1:20PM-1:55PM: 35 Min. Take down brake beam Car 5934 A end.
Cumbres: 2:25PM-2:55PM 30 Min. Pick up, test air.
Chama: 4:00PM-4:40PM Put Away.
CONDUCTOR'S SIGNATURE: Cox
TRAIN DELAY REPORT
TRAIN NO.: Ex ENGINE NO.: 494 DATE: 10-18-1950
Chama 4:30PM-5:05PM 1Hr 5 min. Make Up Train
Cumbres 7:05PM-7:35PM 30 Min. Set out fire water car.
Note: due to the fact that the copies are the 3rd copy of 3 carbons, it's hard to read, above could also be read as: Set Out, Fire, Water Car. or Set Out, First water car.
Chama 8:40PM-9:50PM 1 Hr. 10 Min.Switch out and weigh Eastbaound loads,
Put up coal.
CONDUCTORS SIGNATURE: Cox
TRAIN DELAY REPORT
TRAIN NO.: Ex. ENGINE NO.: 494 DATE: 10-19-1950
Chama 6:00AM-6:55AM 55 Min. Make up train, air.
Cresco 7:45 AM-8:00AM 15 Min. Meet Ex 491-495 West.
Cumbres 8:30AM-8:45AM 15 Min. Set out, Turn.
Chama 8:50AM-9:00AM 10 Min. Put away.
I hope he ment 9:50-10:00AM, otherwise a 5 minute run down the hill would have been a site to see.
CONDUCTORS SIGNATURE: Cox