Ive been checking up there in Grapevine almost every weekend since the beginning of February and never have been able to get a good pic of the cylinder I'm sure glad somebody was able to. The weld is the 3rd weld that was done the previous 2 didn't hold well when they were sleeving it. When I was last there the guys up there told me the same about the first run now being the 20th,after the Thomas events. The original first run was supposed to be February 27th but a gasket was blown and I think they said not all of the the runs had been done that needed to be done prior to pulling a passenger train.