Re: Gunnison Coaling Tower

October 15, 2009 01:30PM
The following is not about the coal tipple, but thought it might be interesting to some...

September 1937
RIO GRANDE YARDS GETTING IMPROVEMENTS

55 Year Old Roundhouse Being Remodeled for Big Engines; Stock Yards
Will be Lighted For Night Loading.

The first major improvements to the 55 year old roundhouse in the Gunnison yards of the D&RGW are underway this week, with 6 stalls being raised and lengthened to accommodate engines of the 490 class.
When built way back in 1882, the height of the doors--11 feet, 6 inches--was sufficient to accommodate the engines used in that period.
Several years ago, 3 of the stalls were remodeled to accommodate the bigger type of engines; but with 6 of the big engines on the job now a day, 3 of them had to sit outdoors when not in use, and during the winter months it was decidedly unhandy to service them.
Under new plans, clearance of the six stalls will be raised to 15 feet clearance in front and a corresponding 3 and 1/2 feet more clearance in back. The extension in back will be 11 feet, 6 inches giving a total length of 76 feet, 6 inches.
W.S. Gilmer, general foreman, will have a new office built in one corner of the building. The whole heating system will be revamped into steam heat, doing away with the old heater type stoves. A blower system will be installed, which will make a forced draft through the building clearing out fumes.
Work on enlarging and improving the stock pens and loading chutes is nearly completed. Two additional pens have been built on the east. A water line has been run to the pens. New chutes have been constructed, and the grounds and pens will be lighted electrically for loading at night.
A new Fairbanks scale has been installed whereby it becomes possible to weigh stock being shipped, and thereby determine shrinkage in transit. The scales will accommodate one up to a dozen head of livestock at one time.
The scheduled improvements include an additional skeleton pit, used when it is necessary to get under engines to repair or service them. This will give the yards two pits.
The construction work is under the direction of A.J. McKenzie, bridge and building foreman, and he has 30 men working under him.

Jerry Day
Longmont, CO

ptillery Wrote:
-------------------------------------------------------
> Hello group,
> First posting here.
> I know that both the Chama and Durango coaling
> towers have been well covered, however, does
> anyone know what color the Gunnison coaling tower
> was? Was it painted or was it bare wood,etc?
>
> Thanks,
> Patrick Tillery
Subject Author Posted

Gunnison Coaling Tower

ptillery October 14, 2009 11:05PM

Re: Gunnison Coaling Tower

Jerry Day October 15, 2009 10:52AM

Re: Gunnison Coaling Tower

TonyK375 October 15, 2009 10:53AM

Re: Gunnison Coaling Tower

BillD October 15, 2009 11:02AM

Re: Gunnison Coaling Tower

Jerry Day October 15, 2009 01:30PM