John...According to you, the switch for a MOW SPUR, to be built on the site of the old Coxo siding, was installed, with completion of the spur to come.
A siding has a switch at each end, connecting it to another track, a spur only one.
Edited 2 time(s). Last edit at 10/03/2009 10:32AM by Abqfoamer.