For those who have wondered what kind of progress has been made on the E&P combine,here is a fairly recent picture of it. Although not visible, the brake system has been installen and the interior is also being put in....slowly. when this picture was taken I was starting to fit up the drip rail on the clearstory roof....a certified pain in the neck.
The different colors on the poplar wood on the outside is due to it having been painted with boiled linseed oil. The primer and paint will cover all that up.
The maple floor has been installed, and it is a true pleasure to be able to walk like a human inside. Also, the patterns for the art work are almost complete.
Dan Markoff