The 1203 is 99% complete and made three trips to Sumpter in the last two days with eight loads and three empties staying in full throttle, a burned out headlight bulb being the only apparent problem. The Silver Plume enginehouse may have a new resident by Christmas.
We needed a switch engine today to move 19 for some servicing work: