Part of the federal grant was assigned to the S Wye project. Unfortunately, the engineering estimates for building a replacement bridge over the river (the tail switch is actually part way on it) was substantially more than the available funding. The costs are somewhat high due to trying to build footings in dredge tailings, and not putting any piers or pilings in the river itself which requires Army Corps of Engineers approval. The preliminary engineering is done and paid for, but other funding is needed to actually build it.



Edited 1 time(s). Last edit at 11/03/2007 11:22AM by Dan Robirds.
Subject Author Posted

SVRy S wye

Jim Spicer November 03, 2007 10:40AM

Re: SVRy S wye

Dan Robirds November 03, 2007 11:07AM

Re: SVRy S wye

Rick Steele November 03, 2007 11:23AM

Re: SVRy S wye

dan November 03, 2007 12:13PM

Re: SVRy S wye

Jim Spicer November 03, 2007 12:12PM



Sorry, only registered users may post in this forum.

Click here to login