Structure #16
9 Stall brick 67'x157'x19' with machine and blacksmith shop addition 57'x58' 185': 261022 C.F. $13,312.
Foundation $5,421.
Engine Pits $2,934.
Heating $6
Pipe lines & mech. equipment $1,795
Furniture $1,053.
Total $24,521.
A.F.E. 4534 12-17-29 Partition in Engine house:
Partition 67'x19' S.H. tin on S.H. 1" pine ,1 door 4'x6'6" $105.07
A.F.E. 1652 7-30-24 Electric power wireing in machine shop:
Detroit eng. 3 1/2 KW 60 Cyc. generator S.H.
600 LF No. 14 copper wire, knob and tube
24 Droplights
Switch and fixtures
Total $205.38
Next post will contain the Retirements.......