Alamosa February 9 1949

February 09, 2014 11:37AM
Wednesday February 9 1949

ALAMOSA

Alamosa clear, calm

Cumbres 7:30 AM clear, calm

Chama 8:30 AM clear, calm, 40” old snow

Durango 8:20 AM clear, calm, 30” old snow

Alamosa extra 487-488 west with rotary OY
Conductor Boles
Engine 487 Hindelang
Engine 488 Dalla
Rotary OY engineer Brinsfield
Rotary OY pilot Oberrich
On board T C Cummins, J F Selby, H V Meek

Depart Alamosa 4:40 AM
Arrive Antonito 6:00 AM, 35 minutes coal & water rotary
Sublette 9:10 AM
Arrive Osier 11:15 AM
Depart Osier 11:40 AM
Arrive Cumbres 1:20 PM, 1 hour 5 minutes clear yard
Depart Cumbres 2:25 PM
Arrive Chama 4:05 PM

No. 215 with engine 483, at Chama trade for engine 478
Conductor Duxstadt
Engineer Nissen (to Chama)
Engineer Dieckman (from Chama)

Depart Alamosa 11:30 AM with 4 cars
66
164
312
Durango
Arrive Cumbres 2:34 PM
Depart Cumbres 2:40 PM
Delayed 30 minutes behind rotary
Arrive Chama 4:10 PM, change engines, meet No. 216
Depart Chama 4:25 PM
Arrive Durango 9:10 PM with 4 cars

No. 216 with engine 489, at Chama trade for engine 483
Conductor Edmisten
Engineer Cummins (to Chama)
Engineer Nissen (from Chama)

Depart Durango 11:15 AM with 4 cars
119
167
323
Alamosa
Arrive Chama 4:00 PM, meet No. 215, 1 hour 10 minutes condition engine 483, change to engine 483
Depart Chama 5:15 PM
Arrive Cumbres 6:02 PM
Depart Cumbres 6:05 PM
Los Pinos 15 minutes account air hose parting
Big Horn 15 minutes meet extra 482-484 west
Arrive Alamosa 10:00 PM with 4 cars

Standard gauge No. 116 departed Alamosa after arrival of No. 216

Chama extra 480 west, Lumberton turn
Conductor Knight
Engineer J Connor

Called for 8:30 AM, 3 hours 45 minutes flange yard with engine 478, 25 minutes eat, 15 minutes condition engine 480

Depart Chama 12:55 PM with 2 loads 1 empty, flanger
Azotea 10 minutes flange side track
Monero 10 minutes flange side track
Arrive Lumberton 2:35 PM with 2 loads 1 empty, flanger, 30 minutes flange side track, turn
Extra 480 east depart Lumberton 3:05 PM with 1 load 1 empty, flanger
Arrive Monero 3:30 PM, 40 minutes switching, 1 hour 5 minutes meet No. 215, 25 minutes water and pick up
Depart Monero 5:40 PM
Arrive Chama 6:50 PM with 16 loads 1 empty, flanger

Alamosa extra 482 west with helper engine 484
Conductor Young
Engine 482 Groshart
Engine 484 J W Johnson

Depart Alamosa 3:30 PM with 4 loads 7 empties
Arrive Antonito 4:45 PM with 4 loads 7 empties, 55 minutes set out and pick up, coal & water and unload merchandise
Depart Antonito 5:40 PM with 45 loads 1 empty
Arrive Big Horn 7:25 PM, 45 minutes wait for and meet No. 216
Depart Big Horn 8:10 PM
Sublette 1 hour 25 minutes water, eat and pick up B&B outfits
Arrive Cumbres 1:30 AM with 54 loads 1 empty, 45 minutes helper engine off, inspection
Extra 484 west depart Cumbres 2:00 AM light for Chama
Extra 482 west depart Cumbres 2:20 AM with 54 loads 1 empty
Arrive Chama 3:35 AM with 54 loads 1 empty

SALIDA

Marshall Pass 9:00 AM snowing light, light W wind

Sargent 8:25 AM cloudy, clam, 28” old snow

Gunnison 8:00 AM cloudy, calm, 17” old snow

Salida extra 499 west with helper engines 493 and 492, to Gunnison
Conductor R Young
Engine 499 Veo
Engine 493 Rhodes
Engine 492 Hockett

Depart Salida 2:30 AM with 102 empties
Poncha Jct 35 minutes switching
Mears Jct 20 minutes water
Mile Post 231 10 minutes work on engine 492 sanders
Grays 20 minutes reduce 5 empty gons account bad rail
Arrive Marshall Pass 7:40 AM with 46 empties, 35 minutes helper engines off, inspection, eat
Extra 493 west depart Marshall Pass 8:00 AM light for Gunnison
Extra 492 west depart Marshall Pass 8:25 AM light for Gunnison, behind extra 499 west
Extra 499 west depart Marshall Pass 8:15 AM with 46 empties
Sargent 20 minutes switching, water and coal
Arrive Gunnison 11:10 AM with 46 empties

Salida extra 497 west with helper engine 494, Sargent turn
Conductor Wright
Engine 497 Graham
Engine 494 C D Wilson

Depart Salida 3:00 AM with caboose and flanger OL
Arrive Poncha Jct 3:15 AM, 30 minutes meet extra 499-493-492 west, (meaning run around extra 499 west)
Depart Poncha Jct 3:45 AM
Arrive Marshall Pass 5:30 AM, 20 minutes flange spur
Depart Marshall Pass 5:50 AM
Arrive Sargent 7:15 AM with caboose and flanger, 45 minutes condition engines, 2 hours 10 minutes meet extras 493, 499 and 492 west, 30 minutes get train out of snow

Salida extra 491 west, light engine to Sargent, helper for extra 497 east
Engineer Sidenstricker

Depart Salida 3:55 AM
At Poncha Jct pass extra 499 west
Arrive Sargent 7:25 AM

At Sargent extra 497 east with helper engines 494 and 492 depart Sargent 10:40 AM with 16 loads 1 empty, flanger OL
2 company coal
14 coal CF&I
Caboose
Arrive Marshall Pass 12:10 PM with 16 loads 1 empty, flanger, 40 minutes helper engines off, inspection
Extra 494 east depart Marshall Pass time not shown light for Salida
Extra 491 east depart Marshall Pass time not shown light for Salida
Extra 497 east depart Marshall Pass 12:50 PM with 16 loads 2 empties, flanger
Poncha Jct 15 minutes cut crossing, (empties that had been set out by extra 499 west)
Arrive Salida 3:25 PM with 16 loads 2 empties, flanger

Gunnison extra 498 east, light engine to Salida, helper for extra 499 east
Engineer Hockett

Depart Gunnison 9:00 PM, behind extra 499 east
Arrive Sargent time not shown

Gunnison extra 499 east with helper engine 492, to Salida after Sargent hill turn, at Sargent add helper engine 498
Conductor R Young
Engine 499 Veo
Engine 492 Rhodes
Engine 498 Hockett (on Sargent)

Depart Gunnison 8:40 PM with 59 loads 1 empty
1 coal Hooper
1 coal La Jara
57 coal CF&I
Parlin 15 minutes water
Arrive Sargent 11:35 PM, 35 minutes double in, 1 hour 20 minutes condition engines, add helper engine 498
As Sargent hill turn extra 499 east with helper engines 492 and 498 depart Sargent 1:30 AM with 16 loads 1 empty
Arrive Marshall Pass 3:30 AM with 16 loads 1 empty, set out, turn
Extra 498 west depart Marshall Pass 3:50 AM light for Sargent
Extra 492 west depart Marshall Pass 4:00 AM light for Sargent
Extra 499 west depart Marshall Pass 4:10 AM with caboose
Arrive Sargent 5:20 AM with caboose, 30 minutes set coal, 1 hour 5 minutes condition engines, 20 minutes get train
Extra 499 east with helpers 492 and 498 depart Sargent 7:15 AM with 15 loads 1 empty
Arrive Marshall Pass 8:45 AM with 15 loads 1 empty, 40 minutes helper engines off, pick up, inspection
Extra 498 east depart Marshall Pass 8:55 AM light for Salida
Extra 492 east depart Marshall Pass 9:15 AM light for Salida
Extra 499 east depart Marshall Pass 9:25 AM with 17 loads 2 empties
Not shown set out 2 loads Mears Jct
Arrive Salida 11:30 AM (Feb 10) with 15 loads 1 empty

GUNNISON

Crested Butte branch extra 498
Conductor Anderson
Engineer Braswell

Depart Gunnison 11:05 AM with 8 empties, flanger
Arrive Crested Butte 12:40 PM, 2 hours 25 minutes switching, mine work, inspection
Depart Crested Butte 3:05 PM with 36 loads 1 empty, flanger
27 coal CF&I
1 coal Hooper
1 coal La Jara
7 company coal
Arrive Gunnison 4:40 PM with 36 loads 1 empty, flanger

MONTROSE

Ouray branch extra 456, Ridgway turn
Conductor Mahoney
Engineer Tyrer

Depart Montrose 12:25 PM with 9 loads 1 empty
2 coal Ridgway
2 coal Telluride
3 loads Ouray
2 coal Ouray
Arrive Ridgway 2:25 PM, 2 hours switching
Depart Ridgway 4:25 PM
Arrive Montrose 6:10 PM with 21 loads 1 empty

DURANGO

Silverton branch and Farmington branch no trains

Durango switch engine 375 foreman Rowe engineer Buchanan

Jimmy
Subject Author Posted

Alamosa February 9 1949

Jimmy Blouch February 09, 2014 11:37AM

Re: Alamosa February 9 1949 Attachments

Jim McKee February 09, 2014 11:49AM

Re: Alamosa February 9 1949

CharlieMcCandless February 09, 2014 12:01PM

Re: Alamosa February 9 1949

Jim McKee February 09, 2014 11:56AM

Re: Alamosa February 9 1949

CharlieMcCandless February 09, 2014 01:49PM

Re: Alamosa February 9 1949

Jimmy Blouch February 09, 2014 04:42PM

Re: Alamosa February 9 1949

Jim McKee February 09, 2014 05:21PM

Re: Alamosa February 9 1949

drgwk37 February 09, 2014 12:20PM

Re: Alamosa February 9 1949

Jimmy Blouch February 09, 2014 04:44PM

Re: Alamosa February 9 1949

Jim McKee February 09, 2014 05:48PM

Re: Alamosa February 9 1949

Jimmy Blouch February 09, 2014 10:53PM



Sorry, only registered users may post in this forum.

Click here to login