Welcome! Log In Create A New Profile

Advanced

Lava N.M. Revisit

June 04, 2007 07:52AM
Engineering Report
Page 769 Item #9
Tank, Pump House, Well, Pipe Lines
$8958.00
Structure # 3 Tank Wood 24' dia.,16' high.
timber frame 10' high, concrete foundation $1840.00
Structure #6 Pumphouse-Stone 28'x32' $2157.00
Mech. Eq. (2 Steam pumps & boilers) $2445.00
Well dug 8' dia. 10' deep intake $134.00
Pipe lines 3" GIP ect. $2382.00
Total $8958.00
AFE #1435 10-4-1924
Retire Cameron Simplex Pump &
Vertical 36'x78' Boiler & foundation
(Retire Mech eq. $1100.00)
New:
F-M Oil engine Type Y, 25 HP #548346 Pump.
Mid Continent Duplex 4"x10" cylinder.
Galv. Steel Oil Tank Cap. 1400 Gals.
Concrete foundation 7 CY.
Total $2941.53
AFE # T9709 10-31-1942
Retire Pump, boiler piping, sump and coal bin
from ER
(Mech EQ.) $1345.00
Note: Pumphouse and well are at Los Pinos River,
about 2000' south of tank.
Engineering Report
Page 767 Item #9
Structure #4
Pumpers House
$947.00
Frame, wood shingle roof.
Bld. irregular 9120 CF $748.00
Porches $71.00
Foundation $128.00
(This was down near the Los Pinos River near
Pump House in Account 18,
Division has reported that it is gone.
Correct-Retire
Subject Author Posted

Lava N.M. Revisit

John Templeton (Chama Station Agent) June 04, 2007 07:52AM



Sorry, only registered users may post in this forum.

Click here to login