Exa Oil 21 of 24rd
Departed Durango 1100AM Engs 12, 17, 6 & 220; 12-16-608
Arrived Rico 1205 9-3-405
Departed 115AM Engs 205, 305 & 340; 7-3-330
Arrived Ridgewa 825am (10/24) 6-4-303
Exa Oil 21-22 of 23rd
Departed Ridgeway 120AM (10/26) Eng 301; 11-5-500
Arrived Montrose 330AM (10/26) 16-1-590
Exa Oil 22 of 24th
Departed Durango 1000AM Engs 269-20 & 3; 12-0-476
Arrived Rico 910PM 12-0-476
Departed 940AM Engs 20, 3 & 269 10-0-535
Arrived Ridgeway 850AM (10/25) 6-4-354
Exa Oil 22 of 24th
Departed Placerville 600PM (10/26) Engs 41, 42, 15 & 268; 23-0-588
Arrived Ridgeway 925PM 23-0-588
Departed 1010PM (10/16) Eng 319 23-0-616
Arrived Montrose 1150PM (10/26) 23-0-616
Exta of 25th
Departed Hinkle 619 PM Eng 214; 11-0-210
Arrived Gunnison 740PM 11-0-210
Departed 940PM Eng 456 28-0-800
Arrived Salida 520AM 16-0-400
Extra of 25th
Departed Placerville 1105PM Engs 41, 42, 15 & 269; 22-0-510
Arrived Ridgeway 225AM 22-0-510
Extra of 25th
Departed Moffat 200PM Eng 278; 13-2-413
Arrived Salida 845PM 9-2-251
Exa G58 of 25th
Departed Ridgeway 259 AM Eng 345; 22-0-484
Arrived Gunnison 1235PM 23-0-610
Departed 1245PM Eng 455; 22-0-637
Arrived Salida 650AM 22-0-637
Delays Oil 21
Had 5 oil Salt Lake Delays Trains 20" No. 381 Mancos 35" switching, Glencoe 40" No. 393, Dolores 25" eat 30" switching, Rico 1' 10" switching & inspect
Delays Oil 21-22
Had 5 oil from symbol 21 and 6 oil from symbol 22 Train delayed Ridgeway 39' 55" for power and crew account moving livestock. Symbol 21 lost 36'30" Durango to Montrose Symbol 22 lost 9' 30" Durango to Montrose
Delays Oil 22
Had 10 oil Salt Lake Durango to Rico, 10 oil Rico to Placerville set out 4 oil Placeville account not enough power to handle to Dallas Divide had 6 oil Placerville to Ridgeway delayed Franklin 10" switching, Ute JCT 15" switching, Brayten 20" No. 381, Glencoe 10" switching, Dolores 10" stitching 25" eat, Lizard Head 3'40" for power, Placerville 30" got one super and orders.
Delays Oil 22
Had 4 oil Salt Lake reduced at Placerville by first symbol 22 delayed Placeville 36 hrs for power account handling live stock, Ridgeway 45" switching & make up train and inspect. Lost 33' 50" on schedule Durango to Montrose.
Delays Extra
Had 11 cattle Omaha loaded Hinkle 6 PM delayed Gunnison 1 hour switching and inspect. Made up 1' 50" on schedule.
Delays Extra
Had 22 cattle Denver loaded 11 PM Placerville. No delays
Delays Extra
Had 3 cattle Denver loaded Moffat 120PM. No delays
Delays G58
Had 22 cattle Denver loaded Placerville 11 PM. No delays. Made up 4 hours on schedule.