Monday April 11 1949
ALAMOSA
All stations clear, calm
No. 215 with engine 482, at Chama trade for engine 478
Conductor Hines
Engineer Nissen (to Chama)
Engineer Peterson (from Chama)
Depart Alamosa 7:00 AM with 4 cars
65
169
319
Chama
Arrive Cumbres 10:22 AM
Depart Cumbres 10:23 AM
Arrive Chama 11:10 AM, change engines
Depart Chama 11:15 AM
Arrive Gato 1:15 PM
Depart Gato 1:21 PM
Arrive Durango 4:05 PM with 4 cars
No. 216 with engine 476, at Chama trade for engine 482
Conductor Morgan
Engineer Dieckman (to Chama)
Engineer Nissen (from Chama)
Depart Durango 11:15 AM with 4 cars
66
163
325
Durango
Arrive Gato 1:47 PM
Depart Gato 1:52 PM
Arrive Chama 4:00 PM, change engines
Depart Chama 4:05 PM
Arrive Cumbres 4:59 PM
Depart Cumbres 5:03 PM
Arrive Alamosa 8:30 PM with 4 cars
Alamosa extra 485 west with helper engine 486
Conductor Wilson
Engine 485 Turney
Engine 486 Hall
Depart Alamosa 10:35 AM with 44 (?) loads 3 empties
La Jara 35 minutes set out, station switching
Arrive Antonito 12:30 PM with 39 loads 3 empties, 1 hour 5 minutes set out, station switching, coal & water, eat
Depart Antonito 1:35 PM with 36 loads 2 empties
Sublette 10 minutes water
Los Pinos 25 minutes meet No. 216
Arrive Cumbres 5:50 PM with 36 loads 2 empties, 15 minutes helper engine off, inspection
Extra 486 west depart Cumbres 5:55 PM light for Chama
Extra 485 west depart Cumbres 6:05 PM with 36 loads 2 empties
Arrive Chama 7:10 PM with 36 loads 2 empties
Durango extra 487-489 east
Conductor Blackstone
Engine 487 J Connor
Engine 489 Degani
Depart Durango 11:59 AM with 32 loads 1 empty
Ignacio 15 minutes pick up and switching
La Boca 5 minutes water and meet No. 215
Allison 5 minutes merchandise
Arboles 5 minutes merchandise
Gato 25 minutes eat
Dulce 5 minutes merchandise
Lumberton 5 minutes merchandise
Monero 20 minutes merchandise, coal & water
Arrive Chama 8:25 PM with 32 loads 2 empties
SALIDA
Salida no narrow gauge trains
GUNNISON
No activity
MONTROSE
Montrose switch engine 456 foreman Mahoney engineer Price
DURANGO
Farmington branch extra 473
Conductor Knight
Engineer Cummins
Depart Durango 9:30 AM with 19 loads 1 empty
Carbon Jct 10 minutes switching
Bondad 10 minutes fill cistern and merchandise
Aztec 20 minutes fill cistern and set out
Arrive Farmington 1:25 PM with 11 loads 2 empties, 1 hour 40 minutes eat and switching
Extra 473 east depart Farmington 3:05 PM with 2 loads 11 empties
1 gas Aztec
1 oil Chama
Refinery 15 minutes pick up and set out
Aztec 20 minutes set out and merchandise
Cedar Hill 10 minutes pick up
Arrive Durango 6:55 PM with 1 load 27 empties
Durango switch engine 375 foreman Rowe engineer House
Jimmy