Welcome! Log In Create A New Profile

Advanced

Alamosa February 12 1949

February 12, 2014 04:21PM
Saturday February 12 1949

ALAMOSA

Alamosa 7:00 AM cloudy, calm

Cumbres:
4:10 AM cloudy, light SW wind, no new snow
8:30 AM cloudy, light SW wind

Chama 8:30 AM cloudy, calm, 35” old snow

Chama extra 485-489 east, snow work
Conductor Thayne
Engine 485 Dalla
Engine 489 Oberrich
No detail shown, on duty at Chama 6:00 AM, tie up back at Chama at 6:25 PM (edit 2-14-14)

No. 215 with engine 482, at Chama trade for engine 473
Conductor Morgan
Engineer Holly (to Chama)
Engineer Cummins (from Chama)

Depart Alamosa 7:20 AM with 4 cars, 20 minutes transfer
119
163
323
Alamosa
Romeo 50 minutes left No. box on tank engine 482 hot, re-brassed same
Los Pinos 10 minutes extra 485 east
Arrive Cumbres 11:40 AM
Depart Cumbres 11:43 AM
Arrive Chama 12:25 PM, change engines
Depart Chama 12:30 PM
Arrive Dulce 1:44 PM
Depart Dulce 1:51 PM
Arrive Gato 2:30 PM
Depart Gato 2:35 PM
Arrive Durango 5:15 PM with 4 cars

No. 216 with engine 478, at Chama trade for engine 483
Conductor Edmisten
Engineer Dieckman (to Chama)
Engineer Holly (from Chama)

Depart Durango 11:15 AM with 4 cars
65
164
312
Durango
Arrive Gato 1:47 PM
Depart Gato 1:52 PM
Arrive Dulce 2:58 PM
Depart Dulce 3:00 PM
Arrive Chama 4:05 PM, change engines
Depart Chama 4:10 PM
Arrive Cumbres 5:00 PM
Depart Cumbres 5:03 PM
Arrive Alamosa 8:30 PM with 4 cars

Chama extra 486 west, light engine to Lumberton, helper for extra 480 east
Engineer Howe

Depart Chama 5:50 PM, behind extra 480 west
Arrive Lumberton 7:40 PM

Chama extra 480 west, Lumberton turn, at Lumberton add helper engine 486
Conductor Knight
Engine 480 J Connor
Engine 486 Howe (on Lumberton)

Depart Chama 5:40 PM with 6 empties
5 empty dumps
Caboose
Monero 25 minutes switching
Arrive Lumberton 7:30 PM with caboose, 40 minutes switching, turn, add helper engine
Extra 480-486 east depart Lumberton 8:20 PM with 7 loads 1 empty
Monero 15 minutes pick up
Arrive Chama 10:00 PM with 19 loads 1 empty

Alamosa Antonito turn with standard gauge engine 1146
Conductor Young
Engineer J W Johnson

SALIDA

Salida extra 499 west, light engine to Villa Grove, helper for extra 497 east, Valley line
Engineer Hockett

Depart Salida 2:55 PM
Arrive Villa Grove time not shown

Alamosa extra 497 east, Valley line, at Villa Grove add helper engine 499
Conductor Wright
Engine 497 Veo
Engine 499 Hockett (on Villa Grove)

Depart Alamosa 2:15 POM with 15 loads 27 empties
Mosca 10 minutes switching
Hooper 30 minutes switching
Arrive Villa Grove 5:35 PM, 25 minutes coal & water, add helper engine 499
Not shown, flanger picked up somewhere
Depart Villa Grove 6:00 PM
Also not shown, possible double west side of Poncha Pass
Arrive Mears Jct 7:00 PM, helper engine off, switching
Extra 499 east depart Mears Jct time not shown light for Salida
Extra 497 east depart Mears Jct 7:15 PM
Arrive Salida 8:10 PM with 12 (?) loads 2 empties

GUNNISON

Gunnison partly cloudy, light NE wind, 16” old snow

Crested Butte branch extra 493
Conductor Anderson
Engineer Braswell

Depart Gunnison 11:40 AM with 41 empties, flanger
Arrive Crested Butte 1:45 PM, 1 hour 45 minutes switching and inspection
Depart Crested Butte 3:30 PM with 43 loads 1 empty, flanger
43 coal CF&I
Caboose
Arrive Gunnison 5:15 PM with 43 loads 1 empty, flanger

MONTROSE

Ouray branch extra 345
Conductor Mahoney
Engineer Tyrer

Depart Montrose 9:30 AM with 2 loads 1 empty, flanger
Arrive Colona 10:45 AM, 1 hour derailment
Memorandum reads: “10:50 AM Mahoney on fone Colona, has engine 345 derailed 1st crossing east Colona, pony trucks and 3 drivers off and engine pointed out 45 degree angle, apparently caused by ice in crossing, WCG (Graham) in car with engine watchman, going out after Mahoney and crew and engine crew, bring them back to Montrose, get tool cars and section men with engine 456.”
Train crew and engine crew deadhead by auto to Montrose
Depart Colona 11:45 AM
Arrive Montrose, 12:15 PM, 1 hour 5 minutes get engine 456 and eat
Extra 456 west depart Montrose 1:20 PM
Arrive Colona 2:15 PM, 1 hour 20 minutes re-rail engine 345
Extra 456 east depart Colona 3:35 PM
Arrive Montrose 4:55 PM with 2 loads 2 empties, engine 345

DURANGO

Durango 8:00 AM cloudy, calm, 20” old snow

Farmington branch extra 375
Conductor Henry
Engineer S Connor

Depart Durnago 9:55 AM with 18 loads 2 (?) empties, flanger
Mile 450-452 25 minutes cut off and flange snow off track
Bondad 5 minutes fill cistern, 5 minutes merchandise
Aztec 5 minutes fill cistern, 20 minutes switching
Arrive Farmington 2:20 PM with 11 loads 2 empties, 1 hour 40 minutes switching, 40 minutes eat
Depart Farmington 4:40 PM with 1 load 22 empties, flanger
Aztec 5 minutes pick up
Cedar Hill 5 minutes pick up
Arrive Durango 8:50 PM with 1 load 23 empties, flanger

Durango switch engine 315 foreman Rowe engineer Buchanan, 2 hours 35 minutes overtime held for No. 216 and switch passenger equipment

Jimmy



Edited 1 time(s). Last edit at 02/14/2014 09:02AM by Jimmy Blouch.
Subject Author Posted

Alamosa February 12 1949

Jimmy Blouch February 12, 2014 04:21PM

Re: Alamosa February 12 1949

Casey Akin February 13, 2014 09:15PM

Re: Alamosa February 12 1949

Bulby February 13, 2014 09:35PM



Sorry, only registered users may post in this forum.

Click here to login