No. 115 with engine 475
Depart Alamosa 7:10 AM with 7 cars
Antonito set out 2 cars for No. 425
Arrive Cumbres 10:40 AM
Depart Cumbres 10:45 AM
Arrive Chama 11:30 AM
Depart Chama 11:35 AM
Arrive Durango 4:35 PM
No. 116 with engine 470
Depart Durango 11:40 AM with 5 cars
Arrive Chama 4:25 PM
Depart Chama 4:30 PM
Arrive Cumbres 5:24 PM
Depart Cumbres 5:27 PM
Antonito pick up 2 cars rom No. 426
Arrive Alamosa 9:05 PM
Chama extra east with engines 489 and 484 Cumbres turn
Depart Chama 5:55 AM 10 loads 3 empties
Arrive Cumbres 7:25 AM
Engine 484 depart Cumbres 7:40 AM Arrive Chama 8:45 AM
Engine 489 with caboose depart Cumbres 7:35 AM Arrive Chama 8:40 AM
Chama work extra east with engine 482 and spreader
Depart Chama 8:40 AM
Arrive Cumbres 10:15 AM
Depart Cumbres 1:30 PM (apparently worked east, maybe to Big Horn)
Arrive Cumbres 4:40 PM set out spreader, no brakes
Depart Cumbres 4:50 PM
Arrive Chama 5:50 PM
Chama extra east with engines 483 and 484
Called Chama 11:20 PM
Depart Chama 12:55 AM (2-25-39) with 13 loads 5 empties
Arrive Cumbres 2:20 AM
Engine 483 depart Cumbres 2:25 AM light for Alamosa Arrive Alamosa 6:20 AM
Engine 484 with train depart Cumbres 2:40 AM 23 loads 8 empties
Arrive Alamosa 6:45 AM
Santa Fe Branch
No. 425 with engine 473
Conductor Willis
Engineer Holly
Depart Antonito 8:53 AM with 2 loads 8 empties
8 coal Embudo (empty)
RPO 62
Coach 320
Arrive Santa Fe 4:30 PM with 2 loads
No. 426 with engine 471
Conductor Pheney
Engineer Clarke
Depart Santa Fe 9:30 AM RPO 63 coach 306
Arrive Antonito 5:30 PM 3 loads 2 empties
Montrose
Extra west-east with engine 315
Montrose 2 hours 55 minutes switching 30 minutes air and test
Depart Montrose 2:25 PM with 4 loads 3 empties
1 merchandise Ouray
1 coal Ouray
1 coal Ridgway
1 coal Telluride
1 empty tank
2 RGS SD
Arrive Ouray 5:20 PM 1 hour switching and turn
Depart Ouray 6:20 PM (consist info not at hand)
Arrive Ridgway 7:05 PM 45 minutes switching and eat
Depart Ridgway 7:50 PM
Arrive Montrose 9:40 PM
Jimmy