The track plan below the second photo Chris posted does not correspond with the photo. It shows the placement of the second Roundhouse, as does the first image with the map. The second photo itself I've never seen before (thanks Chris!) shows the first Roundhouse and the site still being built! The eating house isn't built yet. The track curving off to the right of the water tank is the mainline to Cerro Summit and the track to the left goes to the stock pens and ends (actually there are 3 parallel tracks with a 3-way stub at either end.) At one time the entire track layout was 3-way switches except for the 2 way stub wye switch toward Cerro across the river and maybe one by the Roundhouse. JP
Edited 2 time(s). Last edit at 11/25/2017 05:12PM by jim pallow.