Tuesday April 26 1949
ALAMOSA
No 215 with engine 476
Conductor Hines
Engineer Holly (to Chama)
Engineer Dieckman (from Chama)
Depart Alamosa 7:00 AM with 5 cars
119
167
306
310
Durango
Arrive Cumbres 10:23 AM
Depart Cumbres 10:25 AM
Arrive Chama 11:10 AM
Depart Chama 11:15 AM
Arrive Gato 1:15 PM
Depart Gato 1:21 PM
Arrive Durango 4:05 PM with 5 cars
No. 216 with engine 484
Conductor Morgan
Engineer Peterson (to Chama)
Engineer Holly (from Chama)
Depart Durango 11:15 AM with 4 cars
65
169
327
Chama
Arrive Gato 1:48 PM
Depart Gato 1:53 PM
Arrive Chama 4:00 PM
Depart Chama 4:05 PM
Arrive Cumbres 5:00 PM
Depart Cumbres 5:03 PM
Arrive Alamosa 8:30 PM with 4 cars
Chama extra 488 west, light engine to Gato, helper for extra 486 west
Engineer Rhodes
Depart Chama 10:55 AM, behind extra 486 west
Lumberton, not shown but appears to pass extra 486 west
Dulce time shown as 12:48 PM
Arrive Gato 1:35 PM, meet No. 216
Chama extra 486 west, at Gato add helper engine 488
Conductor Knight
Engine 486 Connor
Engine 488 Rhodes (on Gato)
Depart Chama 10:10 AM with 38 loads 19 empties
10 empty box
1 empty gon
7 empty dumps
Caboose
Monero 25 minutes merchandise and switching
Lumberton 40 minutes merchandise and pick up
Arrive Dulce 12:45 PM, 13 minutes merchandise and set out
Depart Dulce 12:58 PM
Juanita 15 minutes meet No. 216
Arrive Gato 2:15 PM, 30 minutes merchandise and eat, add helper engine 488
Depart Gato 2:45 PM
Ignacio 10 minutes set out
Arrive Durango 7:25 PM with 35 loads 36 empties
1st Chama Cumbres turn with engines 482 and 489
Conductor Duxstadt
Engine 482 Hall
Engine 489 Turney
Depart Chama 12:10 PM with 11 loads 1 empty
Arrive Cumbres 1:35 PM with 11 loads 1 empty, set out, turn
Extra 482-489 west depart Cumbres 1:45 PM with caboose
Arrive Chama 2:50 PM with caboose
2nd Chama Cumbres turn with engines 487 and 483
Conductor Duxstadt
Engine 487 Hall
Engine 483 Turney
Depart Chama 3:45 PM with 13 loads 1 empty
Location No. 216 by not shown
Arrive Cumbres 5:15 PM with 13 loads 1 empty, set out, turn
Extra 487-483 west depart Cumbres 5:25 PM with caboose
Arrive Chama 6:30 PM with caboose
SALIDA
No narrow gauge trains
GUNNISON
Crested Butte branch extra 498
Conductor Anderson
Engineer Braswell
Depart Gunnison 11:55 AM with 48 empties
Arrive Crested Butte 1:40 PM, 1 hour 35 minutes switching mines and inspection
Extra 498 east depart Crested Butte 3:15 PM with 48 loads 1 empty
38 coal CF&I
2 company material Gunnison
3 coal no bills
5 company coal Gunnison
Caboose
Arrive Gunnison 4:45 PM with 48 loads 1 empty
MONTROSE
No narrow gauge trains
Montrose switch engine 345 foreman Trevarthen engineer Price
DURANGO
Silverton branch and Farmington branch no trains
Durango switch engine 315 foreman Rowe engineer House
Jimmy