Train Dispatcher Sheet
Monday February 12 1962
Alamosa
Alamosa extra west with engines 484 and 494, flanger
Engine 484 Greathouse
Engine 494 Harley
Conductor Murray
Depart Alamosa 4:40 AM with 3 loads 1 empty
Antonito times not shown
Conductors delay report shows turned back at mile post 333, no reason given
Arrive Big Horn time not shown, turn, meet extra 488 west
Depart Big Horn time not shown
Arrive Antonito 3:25 PM
Depart Antonito 3:45 PM
Arrive Alamosa 4:55 PM
Alamosa extra 488 west with helper engine 491
Engine 488 Sisemore
Engine 491 Dunn
Conductor Andriko
Depart Alamosa 10:05 AM with 41 loads 14 empties
Arrive Antonito 11:20 AM, 40 minutes eat, 35 minutes switching, water, coal, and air
Depart Antonito 12:45 PM
Lava 10 minutes water
Sublette 55 minutes clean fire engine 488, water and eat
(page 3 & 4 from letter dated March 1962)
Arrive Cumbres time not shown, 30 minutes helper out, air and retainers up
Extra 491 west depart Cumbres time not shown, light for Chama
Extra 488 west depart Cumbres 6:27 PM
Arrive Chama 7:15 PM with 41 loads 14 empties
Durango extra 499 east
Engineer Shock
Conductor Lyons
Depart Durango 10:30 AM with 1 load 20 empties
Carbon Jct 10 minutes pick up, 10 minutes roll rocks off track
Gato 30 minutes eat, 15 minutes roll rocks off track
Lumberton 10 minutes fill cistern
Mile Post 364ΒΌ 20 minutes double to Monero
Monero 15 minutes fill cistern, 10 minutes coal and water
Arrive Chama 8:25 PM with3 loads 32 empties
Jimmy
Edited 1 time(s). Last edit at 06/15/2019 09:22PM by Jimmy Blouch.