From engineering report page #291 item #2
Structure # 12 Watwe Station
Tank-wood-24'x16' on 11' timber frame
on stone foundation $2293.00
Pipe lines $3521.00
AFE #T6500 1938
Replace pipe Line:
Retire 2030' C.I. pipe & fittings and replace
with 2030' new pipe,3" transite pipe & fittings-5' bury $3008.46
RETIRE IN PLACE AFE #3550- 1955
From engineering report Page #292 item #3
Coaling Station
Structure #4
Coaling Station-Trestle type-389' long-
track elevated 28' above ground-
4-pockets, coaling 2 tracks $5163.00
From engineering report page #293 item #5
Double Outhouse-4'6"x7'x7'6" $63.00
Structure #9
Oil House-second hand car body $163.00
Structure #7
From engineering report page #293 item #7
Structure #5 (part)
Sand House-frame building with wood shingle roof--
18'x24'x14' $461.00
From engineering report page #293 item #8
Structure #6 (part)
Sand Bin-Frame building with wood shingle roof-
15'x32' $229.00
From engineering report page #293 item #4
Structure #8
Engine House-6 Stall-
Frame building with composition roof-108'x71'x20'
153360 cubic feet. $4601.00
Foundation $378.00
Engine Pits $2091.00
Pipe lines $201.00
Furniture $481.00
Total $7752.00
AFE #T8495 1940
Retire Engine house.
From engineering report page #293 item #6
Structure #6
Turntable-62' deck girder $4022.00
AFE #T8495 1940 Retire
AFE #T7107 1938 Install Safety Bulletin
Cabinet-2'10"x2'x6 3/4" $7.02
(Outhouse count:1-single, 4-doubles)
End of Sargents info, next will start up Marshall Pass, No more reports for 3 weeks, as I'am heading down the road to do my annual 3 week Narrow Gauge Circle Tour.