dave2-8-0 Wrote:
-------------------------------------------------------
> The engineering was done and signed off on, after
> we had the contractor go back to the engineer and
> re-design for the extra heavy snow load expected
> in Silverton.
> Wind load I do not know for sure about. That
> discussion never came up. I assume that the
> structural engineer took that into consideration,
> especially after we had him ( engineer) re-design
> for the added snow loading. He was well aware of
> its finished location.
>
> Dave T.
> DRHS BOD
Good to know. I'm sure glad you guys built it! If I were rich I'd build a couple South of the Antonito crossing! JP