These boilers awaiting overhaul in a Buenos Aires locomotive shop dramatically illustrate the difference between boilers on the 2 ft 6 in gauge and the 5 ft 6in gauge in Argentina, I believe that the small boiler belongs to one of the Baldwin 2-8-2s assigned to the Ing. Jacobacci - Esquel line in Patagonia.