#20 will have sections of the frame replaced on both sides to eliminate bad welds as verified by UT. Some welds behind the cylinders were repaired, but economically it is better to replace the frame sections which will require two welds each versus 8 or 9 welds to repair what is there.

The door sheet and rear flue sheet forms are built and the door sheet will probably get flanged next week. We are still waiting for the 2nd course patch to arrive.

The drivers have cracked spokes that will be brazed.

The steel has arrived for the tender tank for 346. The tank will look exactly like the original without the later weld patches. The tender frame is nearly done.
Subject Author Posted

RGS 20

Ted miles February 08, 2008 11:34AM

Re: RGS 20

Bruce R. Pier February 08, 2008 02:23PM

Re: RGS 20

Jim February 11, 2008 09:14PM

Re: RGS 20

Anonymous User February 12, 2008 07:52AM

Re: RGS 20

Linn W. Moedinger February 13, 2008 06:53AM

Re: RGS 20

BillD February 13, 2008 05:56PM

Re: RGS 20

Chatzi473 February 13, 2008 06:49PM

Re: RGS 20

Linn W. Moedinger February 14, 2008 05:21AM

Re: RGS 20

MD Ramsey February 13, 2008 08:09PM



Sorry, only registered users may post in this forum.

Click here to login